求环境工程专业翻译 求环境工程专业翻译的英文文献

\u6c42\u73af\u5883\u5de5\u7a0b\u4e13\u4e1a\u7ffb\u8bd1

The issue of Environmental Engineering curriculum design for the City Economic Development Zone L municipal wastewater treatment plant design - A2O process.

Main task is to select and process design and calculation of structures. During the preliminary design to complete the design specification of a sewage treatment plant in a general layout plan, an elevation map, a flow chart, a map of major equipment. Individual to deal with the construction design of structures, the main plan is to complete the oxidation ditch and profiles. The sewage treatment plant project, with a total size of 240,000 tons / day. The wastewater treatment plant for the sewage treatment process: the sewage from the pumping station to the grit chamber into the aeration tank, secondary sedimentation tank, the final effluent; sludge process as follows: from the secondary sedimentation tank sludge discharged into the first pool enrichment for sludge thickening, and further dehydrated, transported to the landfill.

Sewage treatment plant effluent treatment, the implementation of Integrated Wastewater Discharge Standard (GB8978-1996) 2

Hospital design of wastewater treatment
Abstract: The main hospital discharges from hospital staff and patients of domestic sewage, hospitals Laundry washing sewage, surgical instruments and laboratory analysis of the components, such as flushing sewage, hospitals discharge of sewage every day about 150T. Because the hospital wastewater pollutant concentrations low in basic domestic use of biological exposure to biological oxidation process, against the small amount of hospital waste water treatment characteristics, so choose the form of biological contact acid hydrolysis + aerobic biological treatment as the Programme of biological treatment process. The overall design of sewage treatment station, from 1 m to the grid before the sampling wells after only 1 m, including technology, civil engineering, plumbing, electrical design, and so does not include clean up of segregation, and other channels. .
Key words: hospital wastewater biological contact oxidation acid hydrolysis aerobic biological treatment

The environmental engineering course design task for a L economic development zone, the design of urban sewage treatment plants A2O process. Main task is to select and process design and calculation of the structures.
Among the preliminary design to finish the design specification, a copy of the sewage treatment plant, a general layout, the flow chart, a major equipment figure. Single processing structures in the working drawing design, mainly is completed the oxidation ditch plan and section.
The sewage treatment plant engineering, the total scale to 24 tons/day. The sewage wastewater treatment process for sewage from inner to sink, sand pool, enter aeration, finally, the second pond water, The process of sludge from the second pond for discharge of sludge concentration, the first enter pool of sludge dewatering, concentration, further to landfill.
After the sewage treatment plant water national integrated wastewater discharge standard (GB8978-1996) secondary standard.
Choose A2O craft, has the good function of phosphorus and nitrogen

  • 鎬ユ眰鐜宸ョ▼鐩稿叧璇剧▼鑻辫缈昏瘧!!!璋㈣阿!!!
    绛旓細The water pollution controls engineering 澶ф皵姹℃煋鎺у埗宸ョ▼ The air pollution controls engineering 鍥轰綋搴熷純鐗╁缃 The solid waste handles 鍣0姹℃煋鎺у埗 The solid waste handles 鐏數鍘傜幆淇 Fire power station environmental protection 鐜寰敓鐗 Environment microorganism 鐜褰卞搷璇勪环 The environment influ...
  • 鏈変汉甯繖缈昏瘧涓鐜宸ョ▼鐨勫鏂囩炕璇戜笉
    绛旓細environmental engineering
  • 鐜宸ョ▼涓撲笟璇剧▼鐨勬爣鍑嗚嫳璇缈昏瘧
    绛旓細鎺掓按宸ョ▼ Drainage Works,鐜绠$悊瀛 Environmental Management,鐜瑙勫垝 Environmental Planning,澶ф皵姹℃煋鎺у埗宸ョ▼ Air Pollution Control Engineering,鐜褰卞搷璇勪环 Environmental Impact Assessment,鍥轰綋搴熺墿澶勭悊涓庡缃 Solid Waste Treatment and Disposal,鍣0姹℃煋鎺у埗 Noise Pollution Control.鏈変簺...
  • 姹傜幆澧冨伐绋嬩笓涓氱炕璇
    绛旓細The environmental engineering course design task for a L economic development zone, the design of urban sewage treatment plants A2O process. Main task is to select and process design and calculation of the structures.Among the preliminary design to finish the design specification, a copy...
  • 甯繖缈昏瘧鐜宸ョ▼涓撲笟鐨勮嫳璇:鈥滅幆澧冨伐绋(搴熸按)涓撻」宸ョ▼璁捐鐢茬骇,鐜...
    绛旓細鐜宸ョ▼锛堝簾姘达級涓撻」宸ョ▼璁捐鐢茬骇锛欶irst Class of Environmental Engineering(Waster Water) Special Design.鐜淇濇姢鎶鏈紑鍙戯細technical development of environmental protection 鎶鏈挩璇細technical consultancy 鎶鏈湇鍔★細technical service
  • 鐜宸ョ▼涓撲笟璇嶆眹缈昏瘧
    绛旓細姘磋В閰稿寲:Hydrolysis Acidification 鍘屾哀鐢熺墿:Anaerobic organism 婊ゆ睜宸ヨ壓: aerated filter 姘у寲宸ヨ壓:oxidation technology According to the nature of slaughtering waster water that with high content of organic matters and good at biodegradability, and based on the plans selection, the project adopts...
  • 鎬!鎬!鎬!鐜宸ョ▼涓撲笟鑻辫璇炬枃缈昏瘧,璇疯嫳璇珮鎵嬭繘,鍦ㄧ嚎绛,鍏堣阿璋簡...
    绛旓細杩欑瓒嬪娍寮曡捣蹇ц檻鍏充簬澶卞幓瀹濊吹鐨勫熀鍥犳睜鍜岀敓鎬佺郴缁熺殑鍙樺寲銆傛捣娲嬫薄鏌撱傛薄鏌撶殑鍦扮悆娴锋磱鍜屾捣娲嬫鍦ㄦ伓鍖栥傛薄鏌撶墿鍦ㄦ渤娴佸啿鍒蜂笅鏉,娴,鍜岀煶娌规硠婕忓埌姘撮噷褰撴补杞拰鍏朵粬鑸硅埗纰版挒鍜岄氳繃绂诲哺閽绘帰鍜屽叾浠栨捣娲嬭祫婧愬紑鍙戙傝繖绉嶆薄鏌撲骇鐢熸湁瀹冲奖鍝嶉奔绫诲拰楦熺被,鍚堟垚鐨勨滆丹娼濆鑷撮棶棰樻笖涓氥傚嵄闄╁簾鐗╄秺澧冪Щ杩愩傛墿澶т汉绫绘椿鍔ㄤ娇鍏跺鍔犳墍...
  • 鐜宸ョ▼涓撲笟鐨勭畝浠缈昏瘧
    绛旓細control engineering, the environmental monitoring, the air pollution control engineering, the project charting, solid waste processing and handling, the construction give draining water, general chemistry, hydromechanics, organic chemistry, environment microbiology, environment project principle ...
  • 鐜宸ョ▼鏂归潰鐨勮嫳鏂缈昏瘧
    绛旓細11:44:00 Good point 浣犺鐨勪笉閿 11:44:11 It depends, depend on the location on the plants and the species of the plant,杩欒鐪嬫儏鍐典簡锛岃渚濆巶鐨勫湴鐐瑰拰鍘傜殑绫诲埆鑰屽畾銆11:44:23 It Ok, but it is not good according to the cost-effect analysis due to the building of the each...
  • 扩展阅读:环境工程好考公吗 ... 环境工程好找工作吗 ... 环境工程考公务员岗位 ... 环境工程能考公务员么 ... 环境工程垃圾专业 ... 环境工程适合女生学吗 ... 环境工程最好的出路 ... 环境工程考编好考吗 ... 环境工程是冷门专业吗 ...

    本站交流只代表网友个人观点,与本站立场无关
    欢迎反馈与建议,请联系电邮
    2024© 车视网